Part of a busy road leading into the centre of Aberdeen has temporary traffic lights this weekend.
They were to operate on a short stretch of Wellington Road southof the Souterhead roundabout.
The carriageway was to be reduced to a single lane today andtomorrow while a drainage channel is dug across the road.
The work is part of the pounds5 million scheme to dual the finalsection of Wellington Road.
The traffic lights were due to start at 7.30am today and remainuntil 4pm, with traffic flowing normally overnight.
The signals will be reinstalled at 7.30am tomorrow and removedwhen work is completed later in the day.
Комментариев нет:
Отправить комментарий